The Iberian Reto URL Long Term Project


Jorge Garzón <iberiaDX@...>
 

Hi, 
Paul's (Blundell) projects unfolded our wings and we start a LT project in Spain. Pedro and me (both also members at IberiaDX e-group) proposed the following to Iberian DXers:

Name: Reto OM Iberia Diurna. (Daylight Iberian MW Challenge) 
Dates: 1st week of each month of the year. 
Times: On the Sun cenit time, with a 30' window before and after the exact time. 
Equipment: ULR receivers or small portables. External loops, ferrites, or wires inductively coupled are allowed. Receiver+Antenna system will remain the same every listening session. 
Place: Same grid locator during sessions. 

This activity is aimed to check daylight propagation and variations on groundwave/sky wave components during the year. Also to get up-to-date info on Iberian (E+POR) MW stations. Of course it will show the outstanding performing of small receivers when a good listening spot is chosen, promoting its use. 

¡Saludos y buen DX! 

Jorge Garzón Gutiérrez "IberiaDX" 
(EB7EFA · EA1036 SWL · BDXC Member 1409) 
QTH: IN83ag / 43º15' N · 03º56' W
Urb. San Roque 95, casa 5 (Villasevil)
39698 Santiurde de Toranzo (ESPAÑA - SPAIN)
..................................................................................
Blog: IberiaDX  · Twitter: @IberiaDX

Join main@UltralightDX.groups.io to automatically receive all group messages.